First of all thankyou everyone for all your very kind help through the website.
I am stuck with a problem though and I don’t know How to solve it, would be a great help if you can.
So here it goes. I Schedule meetings for a many of the managers based on the available time and due meetings for them on weekly basis.
Case 1 (For a Single Manager only).
Suppose on a day I am having 10 hours available with me. I have 5 meeting due with me. This will take their respective time. Meeting #1 – 5 Hrs, Meeting #2 – 3 Hrs, Meeting #3 – 3 Hrs, Meeting #4 – 3 Hrs, Meeting #5 – 2 Hours.
So For utilizing My full 10 hours I should choose Meeting#1, Meeting #2 and Meeting#5 =5+3+2 (10hrs). Is there any way to Highlight the scheduled meetings or sort them?
Case 2 (For a Single Manager only – Based on intervals)
Divide My 10 hours of timing in 2 halves (1st & 2nd) of 5 hours each. Lest say In Interval 1 out of my 5 hours I have only 4 hours free for meetings.
Due meetings are Meeting #1 – 2 hrs, Meeting #2 – 3 hrs, Meeting #3 – 0.5 hrs. So I should be doing Meeting#2 and Meeting#3, total 3.5 max hrs to utilize my timing at best.
Case 2.1 If I have 3 meetings Meeting #1 – 2 hrs, Meeting #2 – 3 hrs, Meeting #3 – 1 hrs and have 3 Hours free time.
How do I make it choose Meeting#1 and Meeting#3 Instead Of just meeting#2. Guess I will do It just Manually.
I hope My question makes sense Thankyou for your kind attention.
I am stuck with a problem though and I don’t know How to solve it, would be a great help if you can.
So here it goes. I Schedule meetings for a many of the managers based on the available time and due meetings for them on weekly basis.
Case 1 (For a Single Manager only).
Suppose on a day I am having 10 hours available with me. I have 5 meeting due with me. This will take their respective time. Meeting #1 – 5 Hrs, Meeting #2 – 3 Hrs, Meeting #3 – 3 Hrs, Meeting #4 – 3 Hrs, Meeting #5 – 2 Hours.
So For utilizing My full 10 hours I should choose Meeting#1, Meeting #2 and Meeting#5 =5+3+2 (10hrs). Is there any way to Highlight the scheduled meetings or sort them?
Case 2 (For a Single Manager only – Based on intervals)
Divide My 10 hours of timing in 2 halves (1st & 2nd) of 5 hours each. Lest say In Interval 1 out of my 5 hours I have only 4 hours free for meetings.
Due meetings are Meeting #1 – 2 hrs, Meeting #2 – 3 hrs, Meeting #3 – 0.5 hrs. So I should be doing Meeting#2 and Meeting#3, total 3.5 max hrs to utilize my timing at best.
Case 2.1 If I have 3 meetings Meeting #1 – 2 hrs, Meeting #2 – 3 hrs, Meeting #3 – 1 hrs and have 3 Hours free time.
How do I make it choose Meeting#1 and Meeting#3 Instead Of just meeting#2. Guess I will do It just Manually.
I hope My question makes sense Thankyou for your kind attention.